Description
Working Principle
PSA oxygen generator uses clean compressed air as raw material and zeolite molecular sieve (ZMS) as adsorbent, to produce oxygen gas with Pressure Swing Adsorption (PSA) technology in normal temperature. ZMS is round granular adsorbent full of micro pores inside and outside, which has characteristic of selective adsorption. N2 has higher diffusion rate while O2 has lower, therefore N2 is adsorbed into ZMS while O2 is out of it. With controlling on/off state of the pneumatic valves by PLC, adsorbing under pressure and regenerating without pressure, to separate nitrogen and oxygen gas, and create continuous flow of oxygen with require purity.
Medical use Psa Oxygen Generator for hospital
Here is parts of psa oxygen generator technical data ,and normally for one stage oxygen generator ,purity is 93%-95% ,and for two stage oxygen generator
purity can up to 98% ,but relavant cost is almost double time than 93%
Model
Capacity (Nm3/h)
Purity (%)
Dimensions(mm) LxWxH
Model
Capacity (Nm3/h)
Purity (%)
Dimensions(mm) LxWxH
ZO-3
3
90-95
1200X1200X1800
ZO-3
3
97±1
5500X1200X2000
ZO-5
5
90-95
1200X1200X2000
ZO-5
5
97±1
6000X1500X2150
ZO-10
10
90-95
1600X1500X2150
ZO-10
10
97±1
7000X1700X2550
ZO-20
20
90-95
1800X1700X2550
ZO-20
20
97±1
7500X1700X2600
ZO-30
30
90-95
1900X1700X2600
ZO-30
30
97±1
8000X1900X2750
ZO-50
50
90-95
2100X2000X2750
ZO-50
50
97±1
8500X2000X3200
ZO-100
100
90-95
5500X1550X3200
ZO-60
60
97±1
9500X2100X3200
ZO-150
150
90-95
6000X1800X3500
ZO-80
80
97±1
12000X2200X3200
ZO-200
200
90-95
6600X2000X3700
ZO-100
100
97±1
15000X2600X3500
Q: How long is your delivery time?
A: Generally it is 10-50 working days depending on your order.
Q: How to get a prompt quotation?
A: When you send us inquiry, please kindly tell us the below technical information.
1) O2 Flow rate: ____Nm3/h
2) O2 Purity: ____%
3) O2 Discharge pressure: ____Bar
4) Voltages and Frequency: _____V/PH/HZ
5) Application or use for which industry.
Q: What’s the order process?
A:
1) Inquiry---provide us all clear requirements.
2) Quotation---official quotation form with all clear specifications.
3) Contract confirmation---provide correct contract details.
4) Payment terms--- T/T 30% in advanced, balanced before shipment.
5) Production---mass production g. Shipping--- by sea, air or courier. Detailed picture of package will be provided.
6) Installation and commissioning.